Fabrication & Erection in Vadodara, Gujarat

Single-point turnkey responsibility — we fabricate the structure, transport it, and erect it on your site with our own supervised crew.

Fabrication & Erection at the Matrix PEB works, Vadodara

What Fabrication & Erection Means at Matrix PEB

Fabrication and erection under one contract removes the most common cause of delay on a steel building project: the gap between the party who made the steel and the party who has to put it up. When both are ours, a fit-up query is resolved between our shop and our site crew, not through you.

Our scope covers everything after design approval — fabrication at the Fajalpur works, transport to site, unloading and stacking, erection of primary and secondary framing, sheeting and accessories, and handover with as-built documentation.

Erection is run by our own supervisor working to a written sequence, with alignment and plumb checked bay by bay rather than at the end. Bolts are tightened to specification and a torque check record is kept.

What’s Included

Site survey before fabrication

We measure the actual plot and check access before drawings are released for cutting — the cheapest hour on any project.

Transport & site handling

Consolidated dispatch planned against the erection sequence, with unloading and stacking managed so members are found when needed.

Supervised erection crew

Our own erection team under a Matrix PEB supervisor, not a subcontracted gang hired at the site gate.

Sheeting & accessories

Roof and wall sheeting, ridge vents, turbo ventilators, skylights, gutters, downtakes, louvres, doors and windows fitted as part of the same scope.

Alignment & bolt torque records

Plumb, level and alignment verified bay by bay; connection bolts tightened to specification with the check recorded.

Handover documentation

As-built drawings, material test certificates, torque records and a maintenance note handed over at completion.

Fabrication & Erection Across Gujarat & Madhya Pradesh

We deliver fabrication & erection from our Vadodara works to industrial estates across the region. Pick your city to see how we work there.

Fabrication & Erection — Frequently Asked Questions

Do you take responsibility for both supply and erection?

Yes — that is the point of the combined scope. One contract, one schedule and one party accountable for the structure standing correctly. If something does not fit, it is our problem to solve, not a dispute between two vendors.

How long does erection take?

A standard 1,000–2,000 m² shed is normally erected in about two to four weeks once foundations are cured and the site is clear, including sheeting. Larger or crane-fitted structures take longer. Access, weather and civil readiness are usually what move the date, not the steelwork.

Who does the civil and foundation work?

Foundations are normally executed by your civil contractor to the reaction schedule and anchor-bolt plan we issue. We coordinate the setting-out with them and check bolt positions before erection begins, because a misplaced anchor bolt is the most expensive small error on a PEB site.

Can you erect a structure that someone else fabricated?

We can, subject to reviewing the drawings and inspecting the fabricated material first. We will not take erection responsibility for members we have not verified, because the liability for a fit-up failure would sit with us regardless of who cut the steel.